● Licensed & Insured · CSLB Lic. #1158371(909) 208-8655
Landeros & Sons ConstructionLanderos & SonsCONSTRUCTION Call (909) 208-8655
Kitchen Remodeling · Inland Empire · CSLB Lic. #1158371

A kitchen remodel priced line by line before we touch a cabinet.

Full kitchens typically run $35,000–$95,000 in the Inland Empire. Refreshes start around $18,000. You approve an itemized quote first, and the price we quote is the price you pay.

Free in-home estimates · We pull the permits · Se habla español

Free Kitchen Estimate

We'll come out, measure, and give you an itemized price. No pressure.

Prefer to talk? Call or text (909) 208-8655

30+ YearsBUILDING THE IE
LicensedCSLB #1158371 · INSURED
FamilyFATHER & SONS
FreeESTIMATES & WALK-THROUGHS
Real numbers, up front

What a kitchen costs in the Inland Empire

These are typical 2026 ranges for our area. Your free estimate gives you an exact, itemized number for your kitchen.

ProjectTypical rangeTimelineIncludes
Kitchen refresh$18,000 – $30,0002–3 weeksCabinets painted or refaced, new counters, backsplash, sink and faucet
Full kitchen, same layout$35,000 – $55,0004–6 weeksNew cabinets, quartz counters, backsplash, lighting, flooring
Full kitchen, new layout$65,000 – $95,000+6–8 weeksWalls or plumbing moved, island, electrical upgrades, permits
Appliances are listed as a separate allowance, so you choose your own and see exactly what they add.
✓Demolition doesn't start until your cabinets have a delivery date
✓Plumbing, gas and electrical done by licensed trades, with permits pulled by us
✓Dust walls and floor protection so the rest of the house stays livable
✓Written change orders, signed before any extra work
Our work

A kitchen we built

White cabinetry, a custom hood, granite counters and a seating island.

The process

From first visit to first dinner

STEP 1

Free in-home estimate

We measure, look at plumbing and electrical, and talk through what you want to change.

STEP 2

Itemized quote

Cabinets, counters, labor and allowances listed line by line. You pick finishes.

STEP 3

Order, then build

Cabinets are ordered first. Then demolition, rough work, inspections, cabinets, counters, tile.

STEP 4

Final walk-through

We go through the kitchen together and fix anything on the list before the last payment.

Kitchen questions

Straight answers

How long will my kitchen be out of service?

A refresh takes 2–3 weeks. A full remodel takes 4–8 weeks once work starts. We don't start demolition until your cabinets have a delivery date, so the kitchen isn't torn apart while we wait on an order.

What makes a kitchen cost more?

Three things move the price most: the cabinets you choose, the countertop material, and whether we move plumbing, gas, or walls. Keeping the sink and range where they are is the biggest way to save.

Do I need a permit?

Yes, if we change plumbing, gas, electrical circuits, or walls. We pull the permit and schedule every inspection. Swapping counters or painting cabinets doesn't need one.

Can you remove a wall to open the kitchen?

Usually. If the wall carries the roof or the floor above, an engineer sizes a beam and the city reviews it. We handle that as part of the job.

Can I pick my own appliances?

Yes. We list appliances as an allowance in your quote, so you can buy the ones you want and we install them.

How much do I pay up front?

California law limits the down payment on a home improvement contract to $1,000 or 10% of the price, whichever is less. After that you pay in stages, only as each stage of work is finished.

Where we work

Kitchen remodels across the Inland Empire

FontanaRancho CucamongaUplandOntarioEastvaleChino HillsClaremontRialtoBloomingtonJurupa ValleySan BernardinoRiversideColton
Free estimates · Se habla español

Let's look at your kitchen.

Call, text photos, or send the form. We answer 7am–9pm, every day.

📞 Call now💬 Text us