● Licensed & Insured · CSLB Lic. #1158371(909) 208-8655
Landeros & Sons ConstructionLanderos & SonsCONSTRUCTION Call (909) 208-8655
Showers & Tub Conversions · Inland Empire · CSLB Lic. #1158371

Trade the old tub for a walk-in tile shower.

Tub-to-shower conversions and custom tile showers, typically $8,000–$18,000. Waterproofed, flood-tested, and tiled by our own setter.

Free in-home estimates · About 2 weeks of work · Se habla español

Free Shower Estimate

Text or send the form. We'll measure and give you an itemized price.

Prefer to talk? Call or text (909) 208-8655

30+ YearsBUILDING THE IE
LicensedCSLB #1158371 · INSURED
FamilyFATHER & SONS
FreeESTIMATES & WALK-THROUGHS
Real numbers, up front

What a new shower costs here

Typical 2026 ranges for the Inland Empire. Tile choice and glass are the two things that move the price most.

ProjectTypical rangeTimelineIncludes
Tub-to-shower conversion$8,000 – $14,000About 2 weeksTub out, new pan and drain, new valve, wall tile, glass door
Custom walk-in shower$11,000 – $18,0002–3 weeksLarger footprint, niche, bench, upgraded tile and glass
Low-threshold or curbless showerQuoted on site2–3 weeksLow or no curb, bench, handheld sprayer, grab-bar backing
The glass door is priced in. No surprise add-on at the end.
✓Hot-mop or membrane pan, flood-tested for 24 hours before tile
✓Cement backer board on the walls, never plain drywall
✓New pressure-balanced valve, so the water doesn't scald when someone flushes
✓Solid backing in the walls for grab bars, now or later
Our work

What's under the tile matters most

Finished showers, and the waterproofing step most people never see.

The process

Two weeks, start to tile

DAY 1–2

Demo & plumbing

Tub and old tile come out. Drain and valve are moved to shower positions.

DAY 3–4

Waterproof & test

Pan and walls are waterproofed, then the pan holds water for 24 hours.

DAY 5–10

Tile

Walls, floor, niche and bench are tiled and grouted.

1–2 WEEKS LATER

Glass

Glass is measured after tile so it fits exactly, then installed.

Shower questions

Straight answers

How long does a tub-to-shower conversion take?

About two weeks of work: demolition and plumbing, waterproofing and a 24-hour flood test, then tile. The glass door is measured after tile and usually goes in 1–2 weeks later.

Can I get a shower with no curb to step over?

Often, yes. It depends on your floor framing or slab and where the drain sits. We check that at the walk-through and tell you what's possible before you commit.

Do I need a permit to replace a tub with a shower?

Most cities require one, because the drain and valve change. We pull the permit and schedule the inspections.

Should I keep a bathtub somewhere in the house?

If you have a second bathroom with a tub, converting this one is rarely a problem. If it's your only tub, think about resale: families with small children often look for one.

Can you add grab bars or a bench?

Yes. We can build in a tile bench and put solid backing in the walls, so grab bars can go in now or years from now without opening the tile.

How much do I pay up front?

California law limits the down payment on a home improvement contract to $1,000 or 10% of the price, whichever is less. After that you pay in stages, only as each stage of work is finished.

Where we work

Shower remodels across the Inland Empire

FontanaRancho CucamongaUplandOntarioEastvaleChino HillsClaremontRialtoBloomingtonJurupa ValleySan BernardinoRiversideColton
Free estimates · Se habla español

Let's look at your shower.

Text a photo of your tub or shower and we'll tell you what's possible. We answer 7am–9pm.

📞 Call now💬 Text us